PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Installing pipe hangers at the 2nd floor Facing East.jpg Installing sanitary piping at the 2nd floor bathroom Facing West.jpg Metal framing around the steel arch at the 2nd floor Facing East.jpg Started metal framing the lower roof at the West Elvation.jpg Storm piping going into the 2nd floor Facing South.jpg
Previous page Storm piping going into the 2nd floor Facing South
Storm piping going into the 2nd floor Facing South